The square slab, created from 75mm travertine, required precise trimming on site to allow fitting. Aquablast was called in to make the required cuts with as little dust and disruption as possible because of the very tight space available at the rear of No. 1 Court.

Picture: Preparing to trim the stone Wimbledon logo
A two-man crew set up an Aquablast abrasive waterjet mobile package and were off site within four hours. The new logo fitted like a glove.
